city_retrofit/hub/data/costs/montreal_costs.xml

90 lines
5.2 KiB
XML
Raw Normal View History

2023-02-01 10:38:38 -05:00
<archetypes>
<archetype function="residential" municipality="montreal" currency="CAD">
<capital_cost>
<structural cost_unit="currency/m3"> 56 </structural>
<sub_structural cost_unit="currency/m2"> 9.8 </sub_structural>
<envelope>
<opaque>
<reposition cost_unit="currency/m2"> 43.4 </reposition>
<initial_investment cost_unit="currency/m2"> 36 </initial_investment>
<lifetime_equipment lifetime="years"> 50 </lifetime_equipment>
</opaque>
<transparent>
<reposition cost_unit="currency/m2"> 78 </reposition>
<initial_investment cost_unit="currency/m2"> 984.5 </initial_investment>
<lifetime_equipment lifetime="years"> 20 </lifetime_equipment>
</transparent>
</envelope>
<systems>
<hvac>
<heating_equipment_cost>
<initial_investment cost_unit="currency/kW"> 363.5 </initial_investment>
<reposition cost_unit="currency/kW"> 363.5 </reposition>
<lifetime_equipment lifetime="years"> 15 </lifetime_equipment>
</heating_equipment_cost>
<cooling_equipment_cost>
<initial_investment cost_unit="currency/kW"> 363.5 </initial_investment>
<reposition cost_unit="currency/kW"> 363.5 </reposition>
<lifetime_equipment lifetime="years"> 15 </lifetime_equipment>
</cooling_equipment_cost>
<general_hvac_equipment_cost>
<initial_investment cost_unit="currency/(m3/h)"> 363.5 </initial_investment>
<reposition cost_unit="currency/(m3/h)"> 363.5 </reposition>
<lifetime_equipment lifetime="years"> 15 </lifetime_equipment>
</general_hvac_equipment_cost>
</hvac>
<photovoltaic_system>
<initial_investment cost_unit="currency/m2"> 17 </initial_investment>
<reposition cost_unit="currency/m2"> 17 </reposition>
<lifetime_equipment lifetime="years"> 15 </lifetime_equipment>
</photovoltaic_system>
<other_systems>
<initial_investment cost_unit="currency/m2"> 365 </initial_investment>
<reposition cost_unit="currency/m2"> 365 </reposition>
<lifetime_equipment lifetime="years"> 15 </lifetime_equipment>
</other_systems>
<lighting>
<initial_investment cost_unit="currency/m2"> 365 </initial_investment>
<reposition cost_unit="currency/m2"> 365 </reposition>
<lifetime_equipment lifetime="years"> 15 </lifetime_equipment>
</lighting>
</systems>
<surface_finish cost_unit="currency/m2"> 88 </surface_finish>
<engineer cost_unit="%"> 2.5 </engineer>
</capital_cost>
<operational_cost>
<fuel fuel_type="electricity">
<fixed>
<fixed_monthly cost_unit="currency/month"> 0 </fixed_monthly>
<fixed_power cost_unit="currency/kW"> 0 </fixed_power>
</fixed>
<variable cost_unit="currency/kWh"> 5.6 </variable>
</fuel>
<maintenance>
<heating_equipment cost_unit="currency/kW"> 40 </heating_equipment>
<cooling_equipment cost_unit="currency/kW"> 40 </cooling_equipment>
<general_hvac_equipment cost_unit="currency/(m3/h)"> 0.05 </general_hvac_equipment>
<photovoltaic_system cost_unit="currency/m2"> 1 </photovoltaic_system>
<other_systems cost_unit="currency/m2"> 4.6 </other_systems>
</maintenance>
<CO2_cost cost_unit="currency/kgCO2"> 30 </CO2_cost>
</operational_cost>
<end_of_life_cost cost_unit="currency/m2"> 6.3 </end_of_life_cost>
<incomes>
<subsidies>
<construction_subsidy cost_unit="%"> 2 </construction_subsidy>
<hvac_subsidy cost_unit="%"> 1.5 </hvac_subsidy>
<photovoltaic_subsidy cost_unit="%"> 3.6 </photovoltaic_subsidy>
</subsidies>
<energy_exports>
<electricity cost_unit="currency/kWh"> 0 </electricity>
<heat cost_unit="currency/kWh"> 0 </heat>
</energy_exports>
<tax_reductions>
<reductions_taxes cost_unit="%"> 2 </reductions_taxes>
</tax_reductions>
<CO2_income cost_unit="currency/kgCO2exported"> 0 </CO2_income>
</incomes>
</archetype>
</archetypes>