Commit Graph

14 Commits

Author SHA1 Message Date
9f97e2b2f2 Improved speed not repeating lcc function. Ready to comment with guille 2023-05-30 08:15:44 -04:00
fa09b48624 Solved all problems. Pending building peak loads, onsite production, pv surface and extra electrical consumption 2023-05-29 22:10:43 -04:00
b49fbcf4f4 Main changed to incorporate NPV calculation for life cycle costs. Excel creation per building 2023-05-29 09:08:06 -04:00
520f0ee7a9 Full structure developed, with outputs as pandas dataframes 2023-05-29 08:06:58 -04:00
c283f3a3e3 Refining of outputs and prepared outputs for the inclusion of system results. 2023-05-27 09:32:42 -04:00
b2bbc7f7ee added retrofitting_year_of_construction for two scenarios 2023-05-02 10:49:53 -04:00
512cd6b81e Incorporation of outputs of all the variables in excel, and pandas dataframe data for yearly values in the cashflow (only capital and reposition, pending operational, end of life and maintenance) 2023-05-01 16:38:45 -04:00
f9bb954be8 some reorganization to avoid hard-coding 2023-04-27 10:20:14 -04:00
4e19afbf98 moved archetype search to the main function and cleaned code 2023-04-26 16:26:06 -04:00
d4de6cc471 Incorporated reposition costs in all scenarios (0,1,2,3) 2023-04-25 21:00:19 -04:00
fcd6dc3436 Main of costs_workflow (with hardcoded values for demands and power) operating. Lifecyclecosts first version 2023-04-25 18:33:09 -04:00
4f01916085 solved capital costs for opaque and transparent calculation 2023-04-25 11:49:17 -04:00
483c24b19e Oriol changes. Not working, trying to understand the logic of the workflow 2023-04-25 09:22:44 -04:00
Pilar
8ce8a098f3 not running program, just a prove of concept to discuss with the team 2022-11-02 17:28:51 -04:00