Program Version,EnergyPlus, Version 9.5.0-de239b2e5f, YMD=2022.03.24 09:16,
** Warning ** Weather file location will be used rather than entered (IDF) Location object.
** ~~~ ** ..Location object=DENVER_STAPLETON_CO_USA_WMO_724690
** ~~~ ** ..Weather File Location=Montreal Int'l PQ CAN WYEC2-B-94792 WMO#=716270
** ~~~ ** ..due to location differences, Latitude difference=[5.70] degrees, Longitude difference=[31.12] degrees.
** ~~~ ** ..Time Zone difference=[2.0] hour(s), Elevation difference=[97.77] percent, [1575.00] meters.
** Warning ** SetUpDesignDay: Entered DesignDay Barometric Pressure=83411 differs by more than 10% from Standard Barometric Pressure=100893.
** ~~~ ** ...occurs in DesignDay=DENVER_STAPLETON ANN HTG 99.6% CONDNS DB, Standard Pressure (based on elevation) will be used.
** Warning ** GetInternalHeatGains: People="724A5285-F823-480C-A7EB-240BBA15A5B1_OCCUPANCY", Activity Level Schedule Name values
** ~~~ ** fall outside typical range [70,1000] W/person for Thermal Comfort Reporting.
** ~~~ ** Odd comfort values may result; Schedule="OCCUPANCY SCHEDULES OFFICE AND ADMINISTRATION".
** ~~~ ** Entered min/max range=[3.8E-002,] W/person.0.6
** Warning ** SetUpDesignDay: Entered DesignDay Barometric Pressure=83411 differs by more than 10% from Standard Barometric Pressure=100893.
** ~~~ ** ...occurs in DesignDay=DENVER_STAPLETON ANN CLG .4% CONDNS DB=>MWB, Standard Pressure (based on elevation) will be used.
************* Testing Individual Branch Integrity
************* All Branches passed integrity testing
************* Testing Individual Supply Air Path Integrity
************* All Supply Air Paths passed integrity testing
************* Testing Individual Return Air Path Integrity
************* All Return Air Paths passed integrity testing
************* No node connection errors were found.
************* Beginning Simulation
************* Simulation Error Summary *************
** Warning ** The following schedule names are "Unused Schedules". These schedules are in the idf
** ~~~ ** file but are never obtained by the simulation and therefore are NOT used.
************* Schedule:Year or Schedule:Compact or Schedule:File or Schedule:Constant=LIGHTS SCHEDULES OFFICE AND ADMINISTRATION
************* Schedule:Year or Schedule:Compact or Schedule:File or Schedule:Constant=REFRIGERATION SCHEDULES OFFICE AND ADMINISTRATION
************* EnergyPlus Warmup Error Summary. During Warmup: 0 Warning; 0 Severe Errors.
************* EnergyPlus Sizing Error Summary. During Sizing: 0 Warning; 0 Severe Errors.
************* EnergyPlus Completed Successfully-- 5 Warning; 0 Severe Errors; Elapsed Time=00hr 01min 10.60sec